SJS Group

ClientT.C.T. spa - Molo Polisettoriale - 74100 Taranto
Chief Project Manager and Site SupervisorIng. Michelangelo Lentini
Associated ConsultantsAssignment in partnership with E&G s.r.l. Rome – Geol. Aldo Teodoro Battaglia
LocationPort Of Taranto, Italy
Completion DateOctober 1st, 2000 - April 20th, 2001
Project SubjectControl Tower of the Container Terminal - Molo Polsiettoriale Port of Taranto.
Services Carried OutPreliminary design, Detail design, For construction design, Site Supervision
Budget€ 945,116.12
Service TypeEPC Activities, Design

CONTAINER TERMINAL – MOLO POLISETTORIALE

The Project has included:

  • Rehabilitation and rejuvenation of mooring berths and yard;
  • Medium and low voltage power network;
  • Medium and low-voltage secondary power network;
  • Construction of port railroad with connection to the Taranto-Metaponto railway line;
  • Construction of New Gate and Customs Area fencing;
  • Facilities for hazardous goods storage and truck wash areas;
  • CCTVC for storage yard; Water purification plant;
  • Reconstruction of the access channel; Container Terminal Control Tower;
  • 3 office and service buildings (reconstruction);
  • 2 Warehouses;
  • Repair Shop; Port station; Border  Inspection Agency premises (reconstruction).