REFURBISHMENT OF THE OPERATIONAL BUILDINGS
The San Cataldo Container Terminal (SCCT), concessionaire of the areas and quay of the Molo Polisettoriale in Taranto, has started the activities of requalification and normative adaptation to allow the operativity of the existing infrastructures and plants. To this purpose, it has defined detailed technical specifications in order to make the buildings operational and has assigned to SJS s.r.l., as General Contractor (EPC FIDIC contract), the design and works execution of refurbishment works related to the buildings listed below:
Section 1: ‘Temporary Gate Building’;
Section 2: Building 1 (Ground Floor and Roof Floor)’;
Section 3: ‘Building 1 (First Floor)’;
Section 4: ‘Workshop building (part of it)’;
Section 5: ‘Building 2 (Ground Floor only)’;
Section 6: ‘ OPS Building’.
The interventions included in the project are the following:
Refurbishment works, excluding structural works;
Functionality checks of the existing technological systems, restoration, integration and replacement of parts of the system to integrate or maintain the efficiency of the existing technological systems.
During the construction works have been executed surveys using SAPR Equipment. The SJS APR pilot has a patent issued by ENAC in accordance with European regulations EASA and can carry out overflights in the presence of people, on urban residential areas and on sensitive infrastructure (highways, power plants, railway lines, etc.).
The construction works have been carried out by the company S.J.S. BUILDINGS s.r.l.